30-60-90 day plan for hotel managers
On this page
A hotel manager runs a building that never closes. Guests arrive at all hours, housekeeping turns rooms against checkout and check-in times, engineering keeps the systems running, and the owner or management company watches occupancy, rate and labor every week. Brand standards, guest reviews and accessibility and safety rules all apply at once. A 30-60-90 day plan for hotel managers should have the new manager work every department and shift first, check the rules that create risk, and then improve guest experience and the numbers against a baseline.
This plan is for the owner, asset manager or management company hiring a general manager or hotel manager for a select-service or full-service property. The general structure is in the 30-60-90 day plan template for new hires. If the property has a restaurant, the 30-60-90 day plan for restaurant managers covers the food and beverage side.
Accessibility and safety rules to check first
As of October 2026, the federal rules a new hotel manager should check in the first month include:
- Accessible room reservations. The ADA rule at 28 CFR 36.302(e) requires a place of lodging, for reservations made by any means, including third parties, to let guests with disabilities reserve accessible rooms in the same hours and manner as other guests, describe accessible features in enough detail for guests to assess them, hold accessible rooms until all other rooms of that type are rented, and block and guarantee the specific accessible room reserved. Check how the property management system and online channels handle this.
- Pools and spas. The federal Virginia Graeme Baker Pool and Spa Safety Act requires public pools and spas to have compliant anti-entrapment drain covers, and some drain configurations need an additional anti-entrapment system. The Consumer Product Safety Commission enforces it. State and local health codes add their own pool rules.
- Chemicals. Housekeeping, laundry and pool staff work with cleaning and pool chemicals. Under 29 CFR 1910.1200, the employer needs a written hazard communication program, safety data sheets readily accessible on every shift and training when employees are first assigned.
- Serious injury reporting. Under 29 CFR 1904.39, a work-related employee fatality must be reported to OSHA within 8 hours, and an in-patient hospitalization, amputation or loss of an eye within 24 hours.
Fire codes, food service permits, alcohol licenses and state employment rules also apply and vary by location. Confirm them with the management company's compliance team or counsel; this is not legal advice.
The 30-60-90 day plan
30-60-90 day plan — [Name], Hotel Manager, [property]
Reports to: [owner / management company / regional director]
Start: [date] Property: [N] rooms, [brand / independent]
Departments: front desk, housekeeping, engineering, [F&B], [sales]
Systems: [property management], [revenue tools], [work orders]
DAYS 1-30 — Work every department; build a baseline
Goals:
- Work a shift in each department, including a night audit
and a weekend checkout morning in housekeeping
- Walk every room type, the pool, back of house, mechanical
rooms and roof with the chief engineer
- Check accessible room reservations in every channel, pool
safety records and chemical training records
- Read guest reviews and the last brand or quality audit
- Baseline: occupancy, ADR, RevPAR, labor per occupied room,
guest scores, out-of-order rooms, work order age
Deliverables by day 30:
- Risk and gap list with dates
- Baseline report the owner agrees with
Check-in: day 30, with [owner / regional director]
DAYS 31-60 — Fix the guest experience basics
Goals:
- Fix the top two review themes at the source (example: slow
check-in at peak times, or room cleanliness misses)
- Reduce out-of-order rooms with engineering
- Match housekeeping and front desk staffing to occupancy
- Close urgent compliance gaps
Deliverables by day 60:
- Review themes and out-of-order rooms tracked weekly
- Compliance gaps closed or dated
Check-in: day 60
DAYS 61-90 — Own the numbers
Goals:
- Review pace and rates with the revenue lead
- Report monthly against budget and the baseline
- Propose a next-quarter plan: staffing, capital needs, one
guest experience priority
Deliverables by day 90:
- Guest and operating measures improving against baseline
- Next-quarter plan agreed with the owner
Check-in: day 90 — full review
What to measure
The standards below are examples only. Use the property's own history and budget, not another hotel's results.
| Measure | Why it matters | Example standard (example only) |
|---|---|---|
| Occupancy, ADR and RevPAR against budget | The owner's core measures | Reviewed weekly with causes for variances |
| Guest scores and review themes | Drives repeat business and brand standing | Top themes falling in frequency |
| Labor per occupied room | The largest controllable cost | Staffing matched to forecast occupancy |
| Out-of-order rooms and work order age | Rooms that cannot be sold are lost revenue | Falling against the baseline |
| Safety and compliance checks | Guest and employee safety | Done on schedule and logged |
A filled example
Hotel manager: Sam Whitaker (invented), an assistant general manager at a larger hotel, joining a 140-room select-service property owned by a small investment group.
Day 30: Found that one online channel did not show accessible room features and that accessible rooms were not blocked once reserved. Six rooms had been out of order for more than a month waiting on parts. Guest reviews repeatedly mentioned slow check-in on Friday evenings.
Day 60: Worked with the brand and the channel manager to fix accessible room descriptions and blocking. Engineering cleared four of the six out-of-order rooms. Added a second front desk agent on Friday evenings and moved housekeeping start times to match checkouts.
Day 90: Out-of-order rooms and check-in complaints fell against the baseline. The owner approved a next-quarter plan that included replacing the pool heater and a staffing plan for the busy season.
What "on track" looks like
| Checkpoint | On track | Worth a direct conversation |
|---|---|---|
| Day 30 | Every department worked; risks listed; baseline agreed | Only office time; no night audit or housekeeping shift |
| Day 60 | Top guest issues being fixed at the source | Responses to reviews but no change in operations |
| Day 90 | Measures improving; quarter plan agreed | Numbers explained only by the market |
Housekeeping and engineering decide the guest experience
Most guest complaints trace back to two departments: housekeeping, for cleanliness and room readiness, and engineering, for anything that does not work. Both are often understaffed and far from the front desk where complaints arrive. A new manager who works a housekeeping shift and walks the building with the chief engineer learns where the real constraints are, such as a laundry that cannot keep up or parts on back order. The housekeeper screening questions and the maintenance manager plan help when those teams need to grow or be rebuilt.
What the owner owes the new manager
- Clear authority over staffing, vendors and spending up to an agreed limit.
- Access to the numbers, including budget, pace reports and past audits.
- A capital process for repairs the operating budget cannot cover.
- A regular review with the same measures each month.
Common mistakes
| Mistake | Result | Fix |
|---|---|---|
| Managing from the office | Problems seen only in reviews | Shifts in every department |
| Ignoring third-party reservation channels | Accessible room failures guests cannot see coming | Check every channel |
| Out-of-order rooms accepted as normal | Lost revenue every night | Weekly review with engineering |
| Staffing to a fixed schedule | Overtime on busy days, idle hours on quiet ones | Staff to forecast occupancy |
Adapting the plan
- Full-service hotels: add food and beverage, banquets and group sales, with department heads owning parts of the plan.
- Branded properties: add the brand's standards training and quality audit preparation.
- Independent hotels: add distribution and revenue management, since there is no brand system to rely on.
If you are hiring for the front of house, the hotel front desk screening questions and the interview guide for hospitality roles cover the roles a hotel manager depends on most.
Questions people ask
What should a new hotel manager do in the first week?
Work a shift in every department, including a night audit, walk every room type, the pool and the back of house with the chief engineer, and read the last few months of guest reviews and any brand quality audit. Collect occupancy, rate, labor, guest satisfaction and out-of-order room data as a baseline.
What ADA rules apply to hotel reservations?
Under the Department of Justice's ADA rule at 28 CFR 36.302(e), a hotel must let guests with disabilities reserve accessible rooms during the same hours and in the same manner as other guests, describe accessible features in enough detail for guests to judge for themselves, hold accessible rooms until all other rooms of that type are rented, and block the specific accessible room once it is reserved. This is not legal advice.
How do you measure a hotel manager's first 90 days?
Against the day-30 baseline: occupancy, average daily rate and revenue per available room against the budget and the property's own history, guest satisfaction scores and review themes, labor per occupied room, out-of-order rooms and work order age, and safety records. Use the property's own numbers, not another hotel's.
Should a new hotel manager change rates in the first month?
Usually not on their own. Rates are often set with a revenue manager, the management company or the brand's tools. In the first month the manager should learn how pricing decisions are made and review recent pace and booking patterns, then propose changes with evidence.